Date
September 2017
Capacity
900 Residents, 135,000 l/day
Product
Enpura UG
Location
Mlolongo, Kenya
Problem
Kigali International Airport required a wastewater treatment solution for its airport expansion. Rwandan environmental authorities are particularly diligent enforcing their wastewater discharge standards.
Solution
The Enpura UG system was chosen as it is particularly useful for dealing with the fluctuating loads that an airport provides.
Benefits
The system is doing an excellent job of meeting the stringent environmental discharge requirements whilst handling the challenging airport waste load.
{gallery}la-salle-catholic-school{/gallery}