The site had an existing wastewater treatment plant utilizing large ponds. These ponds took up a large piece of land. The Enpura Pro above ground system was chosen because
Read More
The school had an existing wastewater treatment plant that had never worked. The plant was discharging untreated sewage and causing odour problems. As a result the school was wasting
Read More
The septic tank was filling up and overflowing requiring expensive exhauster fees. The soak- away pit was creating an extensive “ swamp-like” area due to the “ black cotton”
Read More